Watershed - Eau Galle River (LC03)
Eau Galle River Watershed

Details

The Eau Galle River watershed is approximately 171,440 acres in size and consists of 519 miles of streams and rivers, 252 acres of lakes and 3,943 acres of wetlands. The watershed is dominated by agriculture (40%), forest (34%) and grassland (23%) and is ranked high for nonpoint source issues affecting streams and groundwater.

Date  1996

Ecological Landscapes for Eau Galle River Watershed

Ecological Landscapes

The Eau Galle River Watershed is located in two Ecological Landscapes: the Western Coolee and Ridges and the Western Prairie. The Western Coulee and Ridges Ecological Landscape in southwestern and west central Wisconsin is characterized by its highly eroded, driftless topography and relatively extensive forested landscape. Soils are silt loams (loess) and sandy loams over sandstone residuum over dolomite. Several large rivers including the Wisconsin, Mississippi, Chippewa, Kickapoo and Black flow through or border the Ecological Landscape. Historical vegetation consisted of southern hardwood forests, oak savanna, scattered prairies, and floodplain forests and marshes along the major rivers. With Euro-American settlement, most of the land on ridgetops and valley bottoms was cleared of oak savanna, prairie, and level forest for agriculture. The steep slopes between valley bottom and ridgetop, unsuitable for raising crops, grew into oak-dominated forests after the ubiquitous presettlement wildfires were suppressed. Current vegetation is a mix of forest (40%), agriculture, and grassland with some wetlands in the river valleys. The primary forest cover is oak-hickory (51%) dominated by oak species and shagbark hickory. Maple-basswood forests (28%), dominated by sugar maple, basswood and red maple, are common in areas that were not subjected to repeated presettlement wildfires. Bottomland hardwoods (10%) are common in the valley bottoms of major rivers and are dominated by silver maple, ashes, elms, cottonwood, and red maple. Relict conifer forests including white pine, hemlock and yellow birch are a rarer natural community in the cooler, steep, north slope microclimates. The Western Prairie Ecological Landscape is located on the far western edge of the state just south of the Tension Zone; it contains the only true representative prairie potholes in the state. It is characterized by its glaciated, rolling topography and a primarily open landscape with rich prairie soils and pothole lakes, ponds, and wet depressions, except for forested areas along the St. Croix River. The climate and growing season are favorable for agricultural crops. Sandstone underlies a mosaic of soils. Silty loams that can be shallow and stony cover most of the area. Alluvial sands and peats are found in stream valleys. Historic vegetation was comprised of dry to mesic prairie grasses in the rolling areas and wet prairies in the broad depressions. Open oak savannas and barrens were found on the hilly topography, with small inclusions of sugar maple-basswood forest in small steep sites. Prairie pothole type wetlands were mainly found in St. Croix and Polk counties. Barrens were found along the river terraces of the St. Croix River. Almost half of the current vegetation is agricultural crops and almost a third of the area is grasslands, with smaller areas of open water, open wetlands, and urban areas. The major forest types are maple-basswood and oak-hickory, with smaller amounts of lowland hardwoods and lowland conifer.

Date  2010

Eau Galle River Watershed At-a-Glance

Impaired Water in Eau Galle River Watershed
River and Stream QualityAll Waters in Watershed

The many trout streams in the Eau Galle River watershed are threatened by the effects of polluted runoff from barnyards and feedlots, streambank grazing, and flooding. Ths combination of pollutants decreases the habitat aquatic organisms need for food and cover. When the streams flood, large amounts of sediment are moved and the high flows scour the streambeds. The change in land use from almost entirely forested to 82 percent agricultural is a key to determining what best management practices would improve the water quality and in-stream habitat. The forested watershed likely had much hgher infiltration rates than the current agricultural uses. Best management practices that reduce the total volume of runoff by increasing infiltration would benefit the streams of this watershed.

Date  1996

Watershed Trout Streams
Watershed Outstanding & Exceptional Resources

Lakes and Impoundments

Impaired Waters

List of Impaired Waters
Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Chippewa River
Status
Complete

Friends Of Beaver Creek Reserve, Inc.: Lower Chip. Ais Coord.: The Friends of Beaver Creek Reserve proposes to fund positons to coordinate AIS control outreach, training, monitoring and rapid response efforts in the Lower Chippewa River. Major project elements to include: 1) Volunteer training and coordination, 2) AIS monitoring, mapping, and SWIMS data entry 3) Development of AIS control plan, 3) Outreach and events.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Dells Pond
Status
Complete

Friends Of Beaver Creek Reserve, Inc.: Lower Chip. Ais Coord.: The Friends of Beaver Creek Reserve proposes to fund positons to coordinate AIS control outreach, training, monitoring and rapid response efforts in the Lower Chippewa River. Major project elements to include: 1) Volunteer training and coordination, 2) AIS monitoring, mapping, and SWIMS data entry 3) Development of AIS control plan, 3) Outreach and events.


Grant Details
Lake Protection Grant
Date
9/1/1995
Waters Involved
Bass Lake
Status
Complete

St. Croix County: Lco-Bass Lake Ordinance Enhansement - County Zoning Position: St. Croix County proposes to hire a half time staff person for five years who will be located in the County Zoning office and will perform the following zoning ordinance enhancement activities for the Bass Lake area:

1. Review and revise permits and other data gathering forms.
2. Review and revise permit issuance procedures.
3. Develop septic certification procedures for home additiond and improvements.
4. Assist the County/townships with developing and implementing tasks 1 - 3.
5. Assist the developing and implementing inspection and enforcement procedures; assist county and townships with implementation.
6. Assist the townships in improving record keeping methods in relation to land ownership changes and property development.
7. Identify and implement training needed for town and county regulators.
8. Assist with bringing sites with zoning violations into compliance with shoreland zoning regulations.
9. Assist in implementing recommendations that follow from the septic plume groundwater study.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bass Lake
Status
Complete

Bass Lake Rehabilitation District: Lmi-Bass Lake Management Plan Implementation: : Bass Lake Management District is sponsoring a Lake Management Planning Implementation project aimed at reducing phosphorus loads and protecting and improving diverse aquatic life through shoreland restoration projects and BMP installations.

Project activities include: Conduct site analysis and design for storm water runoff management, fisheries, and shoreland restoration practices. Provide technical assistance to develop designs and how-to information (DIY and/or landscapers). Establish and install BMP at demonstration sites. Promote installation of shoreland best management practices using demonstration sites as examples. Install 40 fish cribs.

Project deliverables: All data collected, a list and map of demonstration sites and fish cribs, before and after photos of restoration sites, individual site analysis reports, all outreach and event materials, agendas and minutes from advisory committee meetings.

Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Cedar Lake
Status
Complete

Cedar Lake Protection & Rehabilitation Dist: Lmi-Cedar Df Study: Cedar Lake PRD proposes to contract with the U.S. Army Corps of Engineers to conduct a study of Phosphorus (P) loading within Cedar Lake in St. Croix County. Major project elements to include 1) sediment sampling and analysis, 2) water quality sampling and analysis, 3) algae collection and analysis, 4) Lake modeling, 5) study of phosphorus loading, 6) studies of aeration and alum treatment as means of controlling internal loading, 7) comprehensive watershed ag land use assessment, 8) Final report.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Cedar Lake
Status
Complete

Cedar Lake Protection & Rehabilitation Dist: Lmi-Cedar Alum: The Cedar Lake P&RD proposes to apply an initial Alum treatment to Cedar Lake in St. Croix County to reduce phosphorus loading from in-lake sediments, thereby reducing algal blooms and allowing for restoration of the lake's native plant community. Major project elements to include a) Initial alum treatment, b) monitoring, and c) final report.


Grant Details
Lake Protection Grant
Date
4/8/2005
Waters Involved
Hatfield Lake
Status
Complete

City Of New Richmond: Acq-Hatfield Lake Acquisition: The City of New Richmond proposes to purchase the 75.67 acre Carpenter Family parcel on Hatfield Lake in St. Croix County for Lake Protection purposes. Major project elements to include 1) acquisition costs and, 2) associated acquisition costs.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Hay River
Status
Complete

Dunn County: Lco-Shoreland Ordinance Rev.: Dunn County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Nugget Lake
Status
Complete

Pierce County: Lco-Shoreland Ordinance Rev.: Pierce County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
1/27/1997
Waters Involved
Perch Lake
Status
Complete

St. Croix County: Acq-St. Croix County Perch Lake Acquisition: St. Croix County shall participate in the Lake Protection Grant Program by purchasing approximately 67.05 acres of land in the Perch Lake watershed for lake protection purposes.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Perch Lake
Status
Complete

St. Croix County: Acq-St. Croix County Perch Lake Acquisitioin Ii: St. Croix County will acquire 19.8 acres with all rights to land onPerch Lake that will expsnd it's day-use park called Homestead PArklands. The county purchase of the Onstott property will include 100 feet of shoreline at the north end of the property on Perch Lake.

268 feet of shoreline on Perch Lake at the south end of the Onstott property will be protected with the purchase of a conservation easement on 9.2 acres of the property. This prroperty will be referred to as the conservation easement.

These two acquisitions will protect an additional 368 feet of lake front giving more protection to Perch Lake and better management of the ecosystem.


Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Perch Lake
Status
Complete

St. Croix County: Res-St. Croix Co Homestead Parklands On Perch Lake: St. Croix Co. proposes to construct a main park entrance road, one-way park access roads to and from Perch Lake, six parking areas and two infiltration basins. Grading and erosion control measures are designed to protect the water quality of Perch Lake.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Plum Creek
Status
Complete

Pierce County: Lco-Shoreland Ordinance Rev.: Pierce County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Red Cedar River
Status
Complete

Dunn County: Lco-Shoreland Ordinance Rev.: Dunn County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Sinking Creek
Status
Complete

Dunn County: Lco-Shoreland Ordinance Rev.: Dunn County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Tainter Lake
Status
Complete

Dunn County: Lco-Shoreland Ordinance Rev.: Dunn County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Star Prairie Land Preservation Trust: Acq-Cedar Lake (Menke) Acquis. Costs: The Trust seeks $11,567 in reimbursement for costs associated with the acquisition (via donation) of 63 acres on Cedar Lake In St. Croix County.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Whitefish Lake
Status
Complete

Whitefish Lake Conservation Organization, In: Res-Renewal & Retention Of Native Vegetation: The Whitefish Lake Property Owners Association, Inc. will implement a lakewide project to renew and protect vegetation that extends landward and lakeward from the ordinary high water mark of Whitefish Lake. This program will provide for an initial site evaluation/assissment of shoreline properities with the potential for shoreline renewal and /or protection of native vegetation. Cost sharing will be provided for site assessment and evaluation, site design for restoration, and preparation/planting of vegetation. Shallow water areas contiguous with renewal sites will be protected as a "no disturbance zone". The project goal is to renew native vegetation on 45 sites (1/2 of current development) and retain and protect native vegetation on the remaining sites. A$3,000 cost share cap will be implemented per individual renewal site. All properties participating in this program will receive a departmnet approved deed restriction that permanently establishes the vegetative buffer on the parcel. Shoreland restoration projects will be designed and installed in accordance with the NRCS Best Management Practices Definition and Conditions.

Participants in this program will post their property with signs and will allow other lakeshore owners to visit their property for educational purposes. Additional activities will include an information and education program involving Whitefish Lake residents, local and county governments, other lake associations, school children, and conservation groups.

Project deliverables include a final report listing project accomplishments including the number of parcels or lots participating in the program. The Department of Natural Resources will be provided with a paper copy and an electonic copy of all project products. Project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper article(s).


Grant Details
Large Scale Lake Planning
Date
3/15/2023
Waters Involved
Eau Galle River
Status
Complete

Lake Eau Galle: Water Quality Improvement/Surface Water Restoration: The Eau Galle Lake Association is sponsoring a project to develop an Aquatic Plant Management (APM) plan for Eau Galle Lake.

Project final deliverables include: all data collected, copy of survey and results, agendas and minutes for planning meetings, and an APM plan that includes methodologies, results, and management alternatives discussion with an implementation plan.



Specific project activities include: Evaluate aquatic plant data; Aquatic Invasive Species and aquatic plant management education event; Stakeholder Survey; Public meetings and input; Aquatic Plant Management Plan Development



Special Conditions: Draft user surveys must be reviewed and approved by the Department before being initiated; WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for aquatic plant monitoring and aquatic plant management plan development.



This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lake Eau Galle
Status
Complete

Dunn County: Lake Eau Galle Sedimentation Study: The Dunn Co. Land Conservation Department proposes to study sedimentation in Lake Eau Galle. Major project elements include: 1) sediment survey, 2) sediment core analysis, 3) streambank erosion inventory, and 4) dredging plan design. The Department of Natural Resources will be provided with both paper and electronic copies of the report. Study findings will be shared with the public through local news paper articles and public meetings, and will be available to the public at local government office buildings and the public library.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Lake Eau Galle
Status
Complete

Dunn County: Dunn Shoreland Zone Implementation: Dunn County proposes to inventory riparian property ownership, compliance with county buffer standards, and sites providing public access to Lake Eau Galle, Lake Tainter, the Red Cedar River and unincorporated areas on Lake Menomin. Major project elements to include: a) Inventory of shoreline properties and water access points, and b) education and outreach.


Grant Details
Large Scale Lake Planning
Date
3/15/2023
Waters Involved
Lake Eau Galle
Status
Complete

Lake Eau Galle: Water Quality Improvement/Surface Water Restoration: The Eau Galle Lake Association is sponsoring a project to develop an Aquatic Plant Management (APM) plan for Eau Galle Lake.

Project final deliverables include: all data collected, copy of survey and results, agendas and minutes for planning meetings, and an APM plan that includes methodologies, results, and management alternatives discussion with an implementation plan.



Specific project activities include: Evaluate aquatic plant data; Aquatic Invasive Species and aquatic plant management education event; Stakeholder Survey; Public meetings and input; Aquatic Plant Management Plan Development



Special Conditions: Draft user surveys must be reviewed and approved by the Department before being initiated; WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for aquatic plant monitoring and aquatic plant management plan development.



This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Large Scale Lake Planning
Date
11/1/1994
Waters Involved
Lake George
Status
Complete

City Of River Falls: Lake George Restoration/Sediment Reduction Feasibility Study: Development of design concepts which equally consider lake restoration (dredging) and stream restoration. Choose a workable design solution that overall best promotes the following criteria: a) stormwater management/sediment reduction, b) improvement offish and wildlife habitat, c) integrates goals of downtown Master Plan, and d) elevates public awareness of riverine ecology and management. Formulate a strategy for successful implementation which included the following: a) build public support throughcitizen input/education, b) build support of elected and appointed officials, c) formulate realistic construction budget for inclusion in capital improvements project list/timing, d) identify sources of funding, public and private, e) formulate a plan forphysical implementation, and f)integrate plan with UW-River Falls and the River Falls Public school systems environmental family science program. The grantee will disseminate information to the public by entire report mailings, public meetings, localnewspaper articles, a comprehensive management plan and TV and/or radio spots. Project results will be reposited at City Hall, City library, and UW-River Fall library.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake George
Status
Complete

Pierce County: Watershed Analysis- Eau Galle River Watershed: Pierce County proposes to study the influence of various watershed characteristics (topography, land use/land cover, etc.) on Eau Galle River watershed. Activites to include: 1) hydrologic model of the Eau Galle River watershed, 2) Identification of land use practices and sub-watershed areas that are sources of sediment and plant nutrient loading, 3) Analysis of alternative best management practices and projects. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Project results will be diseminated to the public through...


Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
Lake George
Status
Complete

Pierce County: Spring Valley Watershed- Water Quality: Pierce County proposes to continue a study of the influence of various watershed characteristics on Eau Galle River watershed. Project activities for the second phase of this study include continued work on the hydrological model of the Eau Galle River. The Department will be provided with a paper copy and an electronic copy of the final report. Project results will be diseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Lake George
Status
Complete

Pierce County: Eau Galle River Watershed Analysis - Phase 3: Project will provide funding for watershed modeling and planning study components. This project is Phase III of a four phase project. A progress report from the ACOE to Pierce County LCD describing status of the watershed modeling and planning should be considered the project deliverable.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Targeted Runoff - Urban Construction
Date
4/3/2000
Waters Involved
Burkhart Creek
Status
Complete

Village Of Spring Valley: Eau Galle River Trm: provide 70% cost-sharing for construction of streambank protection BMPs


Grant Details
Targeted Runoff - Urban Construction
Date
1/1/2002
Waters Involved
Carr Creek
Status
Complete

Village Of Woodville: Carr Creek Wq Trm: to c-s @70% eligible grantee-installed practices


Grant Details
Urban Nonpoint - Stormwater Planning
Date
1/1/2005
Waters Involved
Carr Creek
Status
Complete

Village Of Woodville: Stormwater Plan & Utility: development of a storm water management plan, to include creation of stormwater, erosion & illicit discharge control ordinances, mapping, assessment of alternative practice installations, and creation of a municipal storm water utility.


Grant Details
River Protection Grant
Date
7/1/2005
Waters Involved
Chippewa River
Status
Complete

Durand Sportsman'S Club: Chippewa Restoration #2: The Durand Sportsman Club proposes to stabilize the stream bank at two sites on the Lower Chippewa River between Ella and Meridean in Dunn and Pepin counties. Major project elements to include: 1) rip rap placement, 2) incorporation of woody structure, 3) seeding and planting of associated upland areas to enhance wildlife habitat. Seeding of upland areas to be done using species from the geographic area as well as with ecotypes from within the region to ensure that intergrity (including genetic) of existing species and habitat is maintained. See Atlas of the WI Prairie and Savanna Flora (Tech. Bulletin No. 191) for geographic location of species. Contact Armund Bartz, 608-785-9019, with questions.


Grant Details
River Protection Grant
Date
7/1/2012
Waters Involved
Chippewa River
Status
Complete

Durand Sportsman'S Club: Chippewa Restore '12: The Durand Sportsmans Club proposes to continue with riverbank restoration on three private properties on the Chippewa River in Pepin County. Project to restore 300 ft. of riverbank on the Polzer property,700 ft. on the Hagness property, and 807 ft. on the Bauer property. Major project elements to include: 1) installation of rip-rap, and 2) re-vegetation of upland banks.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Eau Galle River Watershed
Watershed Recommendations
Best Management Practices, Implement
St Croix Co Rush River Non-TMDL TRM
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system closure, access roads and cattle crossings, animal trails and walkways, critical area stabilization, grade stabilization, heavy use area protection, livestock fencing, livestock watering facilities, riparian buffers, sediment basins, water and sediment control basins, waterway systems, well decommissioning, wetland development or restoration, stream crossing, rip-rapping, shaping and seeding, and livestock fencing to remedy discharges of manure, sediment and phosphorus in runoff.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
Pierce County Dairy BMPs
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system, critical area stabilization, livestock fencing, and roof runoff systems to remedy discharges of manure, sediment and phosphorus in runoff.
1/1/2017
In Progress
Projects
Documents
 
Best Management Practices, Implement
City of New Richmond Stormwater Pond Retro #265
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Specifically, the municipality will construct/install a wet detention pond to remedy discharges of total suspended solids in urban runoff.
1/1/2017
In Progress
Projects
 
Monitor Aquatic Biology
Monitor biology on WBIC: 2055000
Date
Status
Conduct biological (mIBI or fIBI) monitoring on Eau Galle River, WBIC: 2055000, AU:888381
5/21/2016
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
2050000 name Chippewa River TMDL ID 80 Start Mile 20.73 End Mile 37.58
11/21/2011
Proposed
 
Monitor Water Quality or Sediment
Monitor Thompson Lake for TP
Date
Status
Insufficient TP data to make assessment. Further monitoring recommended.
4/24/2019
Proposed
Projects
 
Monitor Water Quality or Sediment
Eau Galle River TP
Date
Status
2012 was a drought year and last two years were generally wetter than normal...I'd prefer getting samples during a normal year. AU: 15609; Station ID: 10009391
5/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Eau Galle River TP
Date
Status
Category 3. Limited sampling show concentrations are below the standard. I'd prefer getting samples during a normal year and assess other assessment units at the same time to put the pieces together. 2018 TP Results: May Exceed. Station: 10009391. AU: 15609.
1/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Knights Creek TP
Date
Status
Category 2. 2018 TP Results: May Exceed. Station: 10028742. Au: 15625.
1/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Eau Galle River TP
Date
Status
Category 2. 2018 TP Results: May Exceed. Station: 483019. AU: 18771.
1/1/2018
Proposed
Projects
 
Stormwater Planning, Implementation
St. Joseph MS4 Planning
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: new construction erosion control ordinance, new storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, new storm water management plan for the developed urban area, and new storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
Hudson Storm Water Management and Master Planning
Date
Status
Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, new storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, updated storm water financing mechanism, new storm water management plan for the developed urban area, and new storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
TMDL Development
Cedar Lake TMDL
Date
Status
The Wisconsin Department of Natural Resources (WDNR) developed a TMDL for phosphorus for Cedar Lake. The TMDL addresses the nutrient impacts and impairments which were identified on the Wisconsin 2002 303(d) list. The Lake is nutrient (phosphorus (P)) impaired as a result of agriculture, internal loading and local land use. Water quality in Cedar Lake is generally poor to very poor, falling into the eutrophic to hypereutrophic category. Summer algal blooms result in foul odors and an unsightly build-up of algae biomass on the shoreline. In addition, trophic conditions in the lake limit rooting depth for emergent vegetation used by the resident fish populations. As a result, these impairments impact the recreational/aesthetic value of the lake and stress sport fish populations.
8/19/2003
In Progress
Projects
Documents
 
TMDL Implementation
Squaw Lake TMDL
Date
Status
This TMDL report is for Squaw Lake, located in the Star Prairie Township, St. Croix County, Wisconsin, in the St. Croix River Basin. The lake is geographically located across portions of Sections 8, 9 and 17 of T31N, R18W of the USGS Somerset North Quadrangle.
4/13/2011
In Progress
Projects
Documents
 
Water Quality Planning
Bear Creek Watershed Planning
Date
Status
The Bear Creek Watershed covers 76.5 square miles in Buffalo and Pepin counties. Bear, Little Bear, and Spring creeks are the three primary sub-watersheds within the Bear Creek Watershed. The watershed drains rolling agricultural and wooded areas with many of the tributaries originating in steep coulees. The watershed also drains one urban area, the City of Durand. All streams within the Bear Creek Watershed drain the eastern slope of the Chippewa River Valley. The Bear Creek Watershed contains typical steep topography characteristic of the driftless or un-glaciated area of the state. Because the most productive and level land is on the valley floor, most farming takes place immediately adjacent to streams. Former prairie and a portion of the forested lands have been converted to agricultural uses. The quality of trout streams in this watershed have improved or degraded as agricultural uses have diminished or increased. Earlier editions of the Lower Chippewa River Water Quality Management Plan indicated the Nelson wastewater treatment plant and Nelson Cheese actory discharged to the Lower Chippewa Basin. Due to a basin oundary change, both are in the Buffalo- Trempealeau River Basin. The majority of the wetlands in the watershed are adjacent to the Chippewa and Mississippi Rivers.
7/1/2010
In Progress
Projects
 
Eau Galle River WatershedWatershed History Note

The Village of Woodville is located in St. Croix County in the Eau Galle River Watershed. As late as 1870, the portion of St. Croix County in the Woodville area was so heavily forested that it was known as the Big Woods. The forests, in conjunction with the west branch of the Eau Galle River, known as Carr Creek, set the stage for lumbering, and the birth of Woodville. The earliest settlers came here as hunters, lumber mill workers and wood choppers. Woodville's first permanent settler was J. M. S. Anderson who arrived in Woodville in 1870 and in 1874 erected a steam saw mill. In 1872, the West Wisconsin Railroad was constructed and later became the Chicago, St. Paul, Minneapolis, and Omaha. A. A. Kelly established a switching station in Woodville and for a time the locality became known as "Kelly's Switch". Anderson also built the first dwelling house and became Woodville's first postmaster in 1875. He kept the mail, which came twice a week, in an old-style milk safe in the center of the room. In 1877, a new mill was built and the company cut up to 36,000 feet of lumber per day. The company store did about $40,000 worth of business a day. The first church was the Methodist Episcopal, built in 1879. In 1907, Woodville had two blacksmith shops, a restaurant, butter maker, butcher, and also a shoemaker. The school then had two years of high school. Woodville was incorporated in 1911. Lights came in 1914 and a water system in 1920.

Date  2010